ECHO production maintenance — Azure → Railway cutover
Resolved
Oct 21, 2026 at 8:37pm UTC
Maintenance window closed. ECHO production (v1.0.156) is operational on Azure. The Azure → Railway cutover was not performed in this window.
Affected services
Updated
Oct 21, 2026 at 8:36pm UTC
Maintenance ended
Affected services
Created
Oct 21, 2026 at 8:05pm UTC
Scheduled maintenance for the ECHO production cutover from Azure to Railway. Write freeze and brief API/web unavailability are expected during the window (about 30–90 minutes). Status: https://status.bankstechnologies.ai
Affected services